Process Steps for Example Customer - Example Part

Video tutorial

Watch our online video tutorial on creating an engineering master.Watch on YouTube
Verified and Ready for release
Verified and ready for release:


Files in the "Issue" folder for Example Customer - Example Part

Other Engineering Master Versions for Example Customer - Example Part
Set current version to:
Current Version "0" , description:

Engineering Master Version 0 for Example Customer - Example Part
S/U TimeRun TimeS/U Pcs
30.00 min.69.04 sec.1.15 min.0.02 hrs.0.00 pc(s)

 

Pricing Structure: Non-PPN or from PPN
QtyCostS/U Pcs
1$11.470.00
Vendor: Sample Vendor
Qty (Linked Qty * Qty needed):1.000000 pcs
UOM: Each
Units Req'd:1.00000 each(s)
| (ALT: 14), Price: $11.47 each(s)
Qty on hand: 0.00, Location:
Last touched: 7/25/2024
Order Lead Time: 30 daysVendor P/N: 1
Part Number 14600 3" x 0.258" x 1.498" Aluminum Channel 6061-T6-Extruded American Standard Cut to size at 17.500 inches long
Quoting RFQ's
VendorPriceLeadNotes
RFQ 1$0.00
RFQ 2$0.00
RFQ 3$0.00

Will not be added to the priority cards.
 

S/U TimeRun TimeS/U Pcs
30.00 min.99.41 sec.1.66 min.0.03 hrs.0.00 pc(s)

 

S/U TimeRun TimeS/U Pcs
30.00 min.106.68 sec.1.78 min.0.03 hrs.0.00 pc(s)

 

S/U TimeRun TimeS/U Pcs
0.00 min.70.59 sec.1.18 min.0.02 hrs.0.00 pc(s)

 



Files in the "Issue" folder for Example Customer - Example Part


Add another process step to Example Part

Machine Ind. Details Description

Your Quick Picks

Your Quick Texts
Global Quick Texts
 Qty needed 
 Price 
 Setup Qty 
Material Margin Step:  
Vendor:  
P/N:  
Lead: days 
Sorted: (Row-Column-Position)
Printing WO:  
Bypass quality check:  
Alert Operator At Clock In/Out:  
To Do Task Notify At Clock In/Out:  

Purchasing Note: 

Tiered pricing Help
Qty (Up to/Between)Material Cost each is