Process Steps for -

Video tutorial

Watch our online video tutorial on creating an engineering master.Watch on YouTube
Verified and Ready for release
Verified and ready for release:


Files in the "Issue" folder for -


Other Engineering Master Versions for -
Set current version to:
Current Version "0" , description:

Engineering Master Version 0 for -
Pricing Structure: Non-PPN or from PPN
QtyCostS/U Pcs
1$11.470.00
Vendor:
Qty (Linked Qty * Qty needed):0.000000 pcs
UOM: Each
Units Req'd:1.00000 each(s)
| (ALT: 7), Price: $11.47 each(s)
Qty on hand: 0.00, Location:
Last touched: 7/25/2024
Order Lead Time: 30 daysVendor P/N: 1
Part Number 14600 3" x 0.258" x 1.498" Aluminum Channel 6061-T6-Extruded American Standard Cut to size at 17.500 inches long
Quoting RFQ's
VendorPriceLeadNotes
RFQ 1$0.00
RFQ 2$0.00
RFQ 3$0.00

Will not be added to the priority cards.
 



Files in the "Issue" folder for -


Add another process step to

Machine Ind. Details Description

Your Quick Picks

Your Quick Texts
Global Quick Texts
 Qty needed 
 Price 
 Setup Qty 
Material Margin Step:  
Vendor:  
P/N:  
Lead: days 
Sorted: (Row-Column-Position)
Printing WO:  
Bypass quality check:  
Alert Operator At Clock In/Out:  
To Do Task Notify At Clock In/Out:  

Purchasing Note: 

Tiered pricing Help
Qty (Up to/Between)Material Cost each is